Monday – Friday: 7 a.m. – 5 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7 a.m. – 5 p.m.General Building Contractor (Class B) · CA CSLB license # 000000VerifyContractor license bond · Surety company on file with the CSLB · Bond # 000000Workers' compensation insurance · Workers' compensation carrier · Policy # 000000
2 more licenses
  • General Building Contractor (Class B) · CA CSLB license # 000000Verify
  • Contractor license bond · Surety company on file with the CSLB · Bond # 000000
  • Workers' compensation insurance · Workers' compensation carrier · Policy # 000000

From first call to keys

The path, in weeks

Design and city review come before any building. The build weeks start once the plans are approved.

  1. Week 1

    Step 1: Lot check

    We read your parcel map, zoning and utility records, then call with what we found: where a unit fits, what kind, and what could get in the way.

  2. Weeks 2 to 3

    Step 2: Site visit and design agreement

    We measure the yard, look at the house and the meters, and talk about who will live there. Design is its own agreement, signed before any build contract.

  3. Weeks 3 to 10

    Step 3: Drawings and engineering

    Floor plan, elevations, structure and energy compliance, drawn with you. You see the plans before they go to the city.

  4. Weeks vary

    Step 4: City plan check

    We submit online and answer the reviewers' comments. State law limits how long a city can take on a complete application; we tell you where yours stands.

  5. 10 to 36 weeks

    Step 5: Build

    Crews start on the foundation or the demolition. The length depends on the type; the cards above give each one.

  6. Last week

    Step 6: Final inspection and keys

    The city inspects, the utility sets the meter and we walk through the unit with you and fix what we find.

Agreements

You sign one thing at a time

Design is its own agreement, signed after the site visit. It covers the drawings, the engineering and the city submittal, and you own the plans.

The build contract comes after the plans are approved, with a fixed scope and a price. Changes during the build are written, priced and signed before the work.

  • Design agreement first

  • Build contract after approval

  • Changes in writing, before the work

Light open room with a kitchen at the far end and a large window

Two payments

What you pay, and when

California limits the down payment on a home improvement contract, and your contract states it. The numbers below are the shape, not a quote.

What you pay, and when
Build contractDesign agreement
WhenBuild contractAfter the city approves the plansDesign agreementAfter the site visit
What it coversBuild contractThe build, from foundation to final inspectionDesign agreementDrawings, engineering, the city submittal
How you payBuild contractA down payment as state rules allow, then stages as work is finished and inspectedDesign agreementIn stages as drawings are delivered
What you keepBuild contractThe unit, the warranty and the permit recordDesign agreementThe plans, even if you build with someone else

Start with the lot check

It takes a few days, and it does not commit you to anything.