Skip to content
Monday – Friday: 7 a.m. – 5 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7 a.m. – 5 p.m.General Building Contractor (Class B) · CA CSLB license # 000000VerifyContractor license bond · Surety company on file with the CSLB · Bond # 000000Workers' compensation insurance · Workers' compensation carrier · Policy # 000000
2 more licenses
  • General Building Contractor (Class B) · CA CSLB license # 000000Verify
  • Contractor license bond · Surety company on file with the CSLB · Bond # 000000
  • Workers' compensation insurance · Workers' compensation carrier · Policy # 000000

Four kinds of ADU

Pick a type, then read the weeks and what is in it

Weeks count the build only, after the city has approved your plans. The price depends on your lot, the utilities and the plans.

  • Junior ADU

    10 to 14 weeks to build. A separate unit made from space inside your house, up to 500 sq ft.

    • Its own entrance, a kitchenette and a bath
    • Drawings, engineering and the city submittal
    • Fire and sound separation from the main house
    • Mini-split heating and cooling
    • Electric panel or water meter upgrades the city requires
    • Repairs to the main house outside the unit
  • Garage conversion

    14 to 18 weeks to build. Your garage becomes a studio or a one-bedroom, usually 350 to 450 sq ft.

    • Insulated, leveled floor and a framed wall where the door was
    • Kitchen, full bath and a mini-split
    • New circuits and a sub-panel
    • Drawings, engineering and the city submittal
    • Foundation repairs found under the old slab
    • A new garage or carport
  • Detached, one bedroom

    22 to 28 weeks to build. About 600 sq ft on its own foundation, with a kitchen, a bath and a laundry closet.

    • Foundation, framing, roof, windows and siding
    • Kitchen, full bath and laundry hookups
    • Plumbing, electrical and a mini-split
    • Drawings, engineering and the city submittal
    • A new sewer line or water meter, if the city requires one
    • Landscaping and fencing
  • Detached, two bedrooms

    28 to 36 weeks to build. Up to 1,200 sq ft, or a one-bedroom over a new garage.

    • Everything in the one-bedroom, with a second bedroom
    • A second bath, or a bath and a half
    • Engineered foundation for a second story, if the plans call for one
    • Drawings, engineering and the city submittal
    • Retaining walls and grading beyond the building pad
    • Landscaping and fencing

The price comes in writing after a site visit and the plans. Permit and utility fees, and any work the plans show on the main house, go on your written quote as allowances.

How pricing works

Six rules we price by

  • Prices come in writing

    Your price depends on your lot, the utilities and the plans, and the written quote is what binds.

  • Allowances are marked

    Permit fees and utility connections go on the quote as allowances and are billed at the actual cost.

  • What is not included is listed

    Landscaping, fencing, retaining walls and work on the main house are separate lines if you want them.

  • Changes are written first

    Anything found behind a wall or under a slab is priced and signed before it is done.

  • We do not promise a return

    We do not estimate rent, resale value or payback. Your lender or a real estate professional can.

  • Payment follows the work

    A down payment as state rules allow, then stages as work is finished and inspected.

A worked example

What one quote looks like, line by line

This is an example, built to show how a written quote is laid out. Your lines will differ.

What one quote looks like, line by line
A 640 sq ft detached one-bedroomA made-up lot with a level yard, a rear alley and utilities about 40 feet from the new unit.
Design, engineering and drawings
Plan check and permit fees (allowance)
Site work and foundation
Framing, roof, windows and exterior
Plumbing, electrical and mini-split
Interior finishes, kitchen and bath
Utility connections (allowance)

A worked example, not an offer. Your quote comes from your lot and your plans. We do not estimate rent, resale value or payback.

Questions

About prices and payment

How does the estimate work?

After the lot check we visit, measure and talk through what you want. A written quote comes with the plans: scope, allowances, what is not included, and the timeline.

What changes the price?

Size, how far the utilities are from the new unit, slope and access, soil, the condition of an old garage slab, finishes, and whether the city asks for upgrades to your electric panel or sewer line.

How much is the deposit, and how do I pay?

California law limits the down payment on a home improvement contract and gives you a short window to cancel. Your contract states both, with dates. After that you pay in stages as work is finished and inspected.

Do you offer financing?

We do not lend money. Many owners use savings, a home equity loan or a renovation loan from their bank. A lender will want the written quote and the plans, and we provide both.

My house was built before 1978. Does that change anything?

It can. Homes built before 1978 may have lead paint. If work disturbs more than 6 square feet of painted surface inside or 20 outside, or touches windows or demolition, federal rules require specific lead-dust work practices by a certified firm. Tell us the year; we say before you sign whether the rule applies and who holds the certification.

Want a number for your lot?

The lot check comes first. A written quote comes with the plans.